Getting a high tunnel through EQIP is a paperwork fight. Here’s the map.

I’m a veteran and a beginning farmer in Kentucky, growing on leased ground. I’m in the middle of getting my own high tunnel funded through USDA’s EQIP program — and I’m publishing everything: the real payment rates, the real vendor quotes, the rules my NRCS agent actually enforces, and the mistakes that can cost you the whole grant.

A high tunnel greenhouse standing in a green farm field

A high tunnel is a steel frame, a sheet of 6-mil plastic, and about four extra months of growing season. EQIP can pay for most of it — if you do things in the right order.

$6.24–$6.96per sq ft — Kentucky’s published FY2025 EQIP rate for a Gothic tunnel, historically underserved (HU) rate
$13,478–$15,034estimated EQIP payment on a 30×72 tunnel in Kentucky at the HU rate
$12,331.38real delivered price I was quoted for that same 30×72 — formal written quote, on this site
90%cost-share tier for veteran, beginning, limited-resource, and socially disadvantaged farmers

What this site does

Three things, all free except the toolkit.

Real payment numbers

EQIP pays by the square foot, and every state publishes its own rates. Most websites wave their hands. This one shows Kentucky’s actual FY2025 schedule numbers and a calculator so you can run your own size.

Open the calculator →

Real vendor prices

I sent formal quote requests to sixteen tunnel suppliers and I’m posting what comes back — delivered price, freight broken out, lead times. Two formal quotes are already on the table, next to the big retailers’ list prices.

See the price table →

The rules, in plain English

NRCS Code 325, the final inspection, the contract-first sequence, stacking drip irrigation on the same contract — ten articles written the way I’d explain it across a truck tailgate.

Browse the articles →

Start with these three

Article 8

Don’t Buy Before the Contract

Buy your tunnel one day too early and EQIP can refuse to pay for it. The whole $12,000. This is the most expensive sentence on the website.

Read it →
Article 1

EQIP High Tunnel Payments: What Kentucky Actually Pays

The published rates, the 30×48 vs 30×72 math, and why the bigger tunnel can leave money in your pocket.

Read it →
Article 4

The Sequence: Contract First, Loan Second, Order Third

The order of operations that keeps you out of debt trouble — including the NRCS option that can delete the loan entirely.

Read it →

The High Tunnel Toolkit — $49

The articles tell you how it works. The toolkit is the working paper: the calculator spreadsheet, the vendor comparison sheet, the exact RFQ email I sent sixteen suppliers, the Code 325 checklist, and the trackers I use myself. One price, no subscription.

Articles

Ten articles. Plain English, real numbers, no fluff. Read them in order if you’re starting from zero — they build on each other.

EQIP Payment Calculator

EQIP pays for a high tunnel by the square foot. Pick your state, your size, and whether you qualify for the historically underserved (HU) rate, and this runs the math the way the payment schedule does.

Kentucky rates: FY2025 published EQIP payment schedule

Your tunnel

Kentucky’s FY2025 rates are loaded below. Every state sets its own.

Kentucky pays more per square foot for Gothic. Article 2 explains why.

×

HU means veteran, beginning farmer (farming under 10 years), limited-resource, or socially disadvantaged. HU farmers get the 90% cost-share tier and can request a 50% advance payment.

Estimated EQIP payment

$13,478 – $15,034
Tunnel footprint2,160 sq ft
Rate used$6.24 – $6.96 / sq ft
Rate basisKY FY2025, Gothic, HU
50% advance (if HU, on request)$6,739 – $7,517

This is an estimate, not a promise. Your payment is set by the contract you sign with NRCS, using the fiscal year’s schedule in effect then. Rates are republished every year and your NRCS agent picks the scenario that matches your site.

Kentucky has no dollar cap on high tunnel payments — it pays rate × square feet. Some states cap it (Louisiana caps high tunnel payments at $20,000 per operation). Ask your agent which rules your state runs.

How to read the range: Kentucky’s schedule lists more than one Gothic scenario (they differ by wind and snow load and site conditions). The low end and high end of the range are the published HU rates for those scenarios. Your agent assigns the scenario — your actual rate lands somewhere in that band.

General-rate note: the published Kentucky numbers on this page are the HU rates, verified against the FY2025 schedule. The general rate shown by this calculator is figured from the same schedule at the standard 75% cost-share tier (HU pays at 90%), so treat it as a close estimate and confirm the exact figure on the current schedule at your NRCS office.

Vendor Prices: Real Quotes vs List Prices

Two kinds of numbers live in this table and they are not the same. A Verified quote is a formal written quote a vendor sent for a specific size, delivered to Paris, Kentucky 40361. A Listing is a published retail price. Quotes expire and listings change — dates are on every row.

Vendor Size quoted Delivered price Freight Wind / snow ratings Lead time NRCS vendor direct deposit? Source
Tunnel Vision Hoops
Gothic, full package: framing, wind bracing, hip rail, baseboards, end-wall kits, 4-yr 6-mil IRAD plastic, personnel door, roll-up sides
30×72 Gothic $12,331.38 Shipping discount of $1,200 applied on the quote; hand unload at delivery (3–5 people) or free pickup in Cleveland, OH Sold as an NRCS high tunnel kit; written load ratings requested from vendor ~15 days Asked in writing Oct 2026 — awaiting reply Verified quote
Oct 13, 2026; expires Nov 12, 2026. Veteran discount with DD-214 available — not in this price
Tunnel Vision Hoops
Gothic, same full package as above
30×48 Gothic $10,112.51 Shipping discount of $983.05 applied on the quote; hand unload at delivery or free pickup in Cleveland, OH Sold as an NRCS high tunnel kit; written load ratings requested from vendor ~15 days Asked in writing Oct 2026 — awaiting reply Verified quote
Oct 13, 2026; expires Nov 12, 2026. Veteran discount with DD-214 available — not in this price
Bootstrap Farmer
All-metal high tunnel kit
30×60 $14,399.99 Listed as shipped price Not stated on the listing used See listing Not asked yet Listing
Retail list price, checked Oct 2026
Bootstrap Farmer
All-metal high tunnel kit
30×40 $11,322.99 Listed as shipped price Not stated on the listing used See listing Not asked yet Listing
Retail list price, checked Oct 2026
Bootstrap Farmer
Derecho series — their high-wind model
24×60 $12,240 Listed as shipped price Marketed as a high-wind design; get the stamped ratings in writing before you rely on them See listing Not asked yet Listing
Retail list price, checked Oct 2026
GrowSpan
30×72 on sale; NRCS rafter kit is a separate line item
30×72 $9,179 + $305 rafter kit Freight not included in the sale price Rafter kit offered for NRCS compliance; written load ratings requested from vendor See listing Asked in writing Oct 2026 — awaiting reply Listing
Sale price, checked Oct 2026 — add freight before you compare it to delivered quotes

The per-square-foot truth: the Tunnel Vision 30×72 works out to $5.71 per square foot delivered. The Bootstrap Farmer 30×60 is $8.00 per square foot shipped. Same money buys more tunnel from one than the other — Article 2 does the full shootout.

This table is still growing. Formal quote requests are out to sixteen suppliers — domestic and overseas — each asked for seven sizes (24×48 up to 30×144), delivered price with freight on its own line, wind and snow ratings in writing, and whether they accept NRCS vendor direct deposit. Rows get added as written quotes come back.

The High Tunnel Toolkit

Everything on this site, turned into working paper. The same documents I’m using on my own EQIP application, cleaned up so you can run yours.

  • ✓
    EQIP payment calculator (spreadsheet)The website calculator as a file you keep — plug in your state’s rate and your size, save your scenarios side by side.
  • ✓
    Vendor comparison spreadsheetEvery column that matters: delivered price, freight broken out, load ratings, lead time, deposit terms. Pre-loaded with the quotes from this site.
  • ✓
    RFQ email templatesThe exact request-for-quotation email I sent sixteen suppliers — the one that makes them break freight out and put load ratings in writing.
  • ✓
    NRCS Code 325 checklistThe standard turned into a one-page check sheet you can walk around your tunnel with before the agent ever shows up.
  • ✓
    Grant-stacking timelineContract, advance, loan, order, build, inspection, final payment — in the right order, with the traps marked.
  • ✓
    Order-list spec sheetsWhat a complete tunnel package actually includes, line by line, so a cheap quote can’t quietly leave off the end walls.
  • ✓
    Site-visit question listThe questions to ask your NRCS agent at the site visit — size, orientation, second tunnel, vendor direct deposit, the works.
  • ✓
    Advance-payment trackerTrack the 50% advance, the bridge, and the final payment so the money side never surprises you.

One-time price

$49

No subscription. No upsell funnel. The files are yours, and when the vendor table gets new quotes, the updated spreadsheet goes out to toolkit owners.

Buy the Toolkit — $49

Secure checkout via Stripe

Who this is for: you have an EQIP application in, or you’re about to file one, and you want the paperwork done once and done right.

Who it isn’t for: anybody who hasn’t talked to their local NRCS office yet. Do that first — it’s free, and Article 1 tells you what to ask.

About

I’m a farmer in Kentucky. I’m also the customer this website is written for.

I’m a veteran. I’m a beginning farmer. I grow on about an acre of leased ground — I don’t own the land, I rent it, and everything I build has to make sense on rented dirt. My operation is a small nursery and market-garden business, and like every small grower I know, I needed a longer season. That means a high tunnel.

A good 30×72 tunnel kit runs about twelve thousand dollars delivered. I don’t have twelve thousand dollars sitting around. What I have is an EQIP application — filed, in the ranking queue, waiting on a site visit from my NRCS agent — and a stack of formal quotes from tunnel companies, because I did the shopping before I did the buying.

High tunnels standing in a row on a working farm under a blue sky

Here’s what I learned fast: the information is all out there, but it’s scattered across federal PDFs, state payment schedules, vendor sales pages, and things your agent tells you in a parking lot that never get written down. The payment rates are published but nobody shows you the math. The vendors all quote differently — one includes freight, one doesn’t, one leaves the end walls off the quote — so the prices can’t be compared until you force them onto the same page. And the single most important rule in the whole program — do not buy anything before your contract is signed — is the one people break because nobody said it loud enough.

So I’m saying it loud, and I’m publishing the rest of it too. Every number on this site is one I’ve used on my own application: Kentucky’s real payment rates, my real delivered quotes, the Code 325 standard as my agent enforces it, the sequence I’m following so I never take on debt before the grant is obligated. When sixteen suppliers answer my quote requests, their prices go in the table. When my site visit happens, what my NRCS agent says goes in an article.

Inside a high tunnel, rows of vegetables growing in the soil under the plastic cover

I’m not a consultant and I’m not selling tunnels. I sell a $49 toolkit of the paperwork I built for myself, because building it twice is a waste of your time. Everything else here is free, because the farmers who need this most are the ones counting dollars the way I do.

If you’re a veteran, a beginning farmer, or anybody farming small on purpose: you qualify for more help than you think, the rates are better than you’ve heard, and the whole thing is winnable if you do it in the right order. That’s the site. Let’s get you a tunnel.